|

Berths are dredged annually in the Fall. Designated depths indicated are the depths to which the berths are dredged at that time.
| Navy Island |
1A |
189 |
10.4 |
12,619 |
. |
Forest Prod |
| . |
1B |
189 |
10.4 |
14,356 |
. |
Shed 1A |
| . |
2A/B |
312 |
9.8 |
10,000 |
. |
Shed 1C |
| . |
3A/B |
312 |
10.1 |
. |
. |
. |
| . |
. |
. |
. |
11,000 |
. |
Shed 1D |
| Total |
. |
. |
. |
47,975 |
6.5 |
. |
| |
| Rodney |
A |
295 |
12.2 |
. |
. |
. |
| . |
B/C/D |
606 |
12.2 |
. |
. |
. |
| Total |
. |
. |
. |
3,414 |
18.2 |
Shed #8(CFS) |
| Pier |
11 |
134 |
9.7 |
. |
2 |
. |
| Pier |
12 |
265 |
9.1 |
6,860 |
2 |
. |
| |
| Long Wharf |
A |
189 |
9.1 |
5,555 |
. |
Shed B |
| . |
B/C |
285 |
10.7 |
|
. |
. |
| Total |
. |
. |
. |
5,555 |
6.1 |
. |
| |
| Pugsley |
North |
92 |
10.4 |
. |
. |
. |
| . |
A/B |
298 |
10.4 |
11,942 |
. |
. |
| . |
C |
232 |
10.4 |
6,216 |
. |
. |
| Total |
. |
. |
. |
18,158 |
0.3 |
. |
| |
| Lower Cove |
. |
245 |
11 |
. |
7.4 |
. |
| |
| Barrack Point |
. |
290 |
12.2 |
22,311 |
. |
Potash Storage |
| |
| Private Facilities |
| |
| Bay Ferries |
. |
183 |
7 |
. |
4 |
. |
| |
| Irving P&P |
. |
139 |
7 |
. |
. |
. |
| |
| D.O.T (4 berths) |
. |
421 |
8 |
. |
. |
. |
| |
Canaport (mooring buoy with pipeline) |
. |
. |
37 |
. |
. |
. |
| |
| Irving Paper |
. |
168 |
. |
. |
. |
. |
| |
Irving Oil (Courtenay Bay #1-4) |
. |
566 |
6-11 |
. |
. |
. |
|